Operation and KPIs: Terms and Definitions

This section covers terms related to gas engine genset operation, key performance indicators (KPIs) and upgrades. It also includes answers to the most frequently asked questions about cogeneration.

Operation and Personnel

Genset Operator

Genset operator (gas engine operator) - a specialist who monitors the operation of a gas engine genset and performs its routine maintenance during operation. Duties include scheduled walk-around inspections, taking readings, making entries in the operating log, identifying deviations and fixing minor faults. To operate Jenbacher units, the operator must complete training provided by KTS Engineering. Large facilities with several units organize round-the-clock operator shifts.

Operating Log and Incident Log

Operating log - a document in which the operator records the date and time of each entry, the unit's operating parameters (oil pressure, temperatures, output, operating hours), completed scheduled work and remarks. It is the main document for monitoring the condition of the plant and a condition for warranty service. Incident log - a separate document recording emergency events, with the error code, a description of the event, the actions taken and the time to restore operation. KTS Engineering analyzes the data in both logs at every service visit.

Unit Operating Modes

Unit operating modes - the defined states of a gas engine genset:

  • Rated mode - operation at 100% load (rated output);
  • Part load - operation at 20-99% of output; acceptable for Jenbacher at a load of at least 20-30%;
  • Idling - the engine runs with no load on the generator; undesirable for long periods because of oil heating and incomplete combustion;
  • Standby mode (hot standby) - the unit is ready to take load immediately after a short warm-up;
  • Cold standby - the unit is stopped and requires the standard start sequence (30-90 s).
Unit Rotation

Unit rotation - scheduled alternation of the units of a modular power plant in operation: the unit with more operating hours is periodically stopped and a unit previously on standby is started. The aim of rotation is to distribute operating hours evenly across the units, bring them to scheduled maintenance at the same time and synchronize overhaul schedules. Rotation is automated in the control system of multi-unit facilities.

Hot and Cold Standby

Hot standby - a unit running at idle or minimum load, ready to take full load immediately or within a few seconds. It is used for critical consumers (hospitals, data centers) where even a 30-90 second power interruption is unacceptable. Cold standby - the unit is completely stopped; start-up takes 30-90 seconds. This is sufficient for most industrial facilities with an ATS.

Key Performance Indicators (KPIs)

Availability

Availability (availability factor) - the share of time in the reporting period during which the unit is in working order and ready for operation. It is calculated as: (total time - downtime for technical reasons) / total time × 100%. For Jenbacher gensets covered by a CSA with KTS Engineering, it is 95% or higher. Standard scheduled shutdowns (maintenance) are excluded from the calculation.

Synonyms: availability factor · technical availability

Reliability

Reliability - the probability of failure-free operation of a unit over a given period under normal operating conditions. The difference from Availability: reliability estimates a probability rather than an actual share of time. It is quantified by MTBF (Mean Time Between Failures) and MTTR (Mean Time To Repair). KTS Engineering keeps failure statistics for the entire fleet of units it services.

OEE (Overall Equipment Effectiveness)

OEE (Overall Equipment Effectiveness) - a composite indicator combining three components of effectiveness:

  • Availability - the share of actual operating time;
  • Performance - the ratio of actual output to the maximum possible output during operation;
  • Quality - the share of electricity generated within specification (without load rejections or parameter deviations).

OEE = Availability × Performance × Quality. For cogeneration plants, the target OEE is 85-95%.

Capacity Factor

Capacity factor - the ratio of actual annual electricity output to the maximum possible output (operating 8,760 h/year at full power). For cogeneration plants running in base-load mode at an industrial facility, the capacity factor is 85-92% (7,500-8,050 h/year). With seasonal consumption or frequent scheduled shutdowns, it is lower.

Synonyms: net capacity factor · plant load factor (PLF)

Heat Rate

Heat rate - the amount of fuel heat energy needed to produce one unit of electricity. It is measured in kJ/kWh or kcal/kWh. The lower the heat rate, the higher the electrical efficiency of the engine. For the Jenbacher J624: heat rate ≈ 7,650 kJ/kWh at an efficiency of 47.1%. The indicator is used to compare the efficiency of different types of generating equipment.

Synonym: specific heat consumption

Specific Gas Consumption (m³/kWh)

Specific gas consumption - the amount of natural gas (in m³ under normal conditions) consumed to produce 1 kWh of electricity. For the Jenbacher J624 at an efficiency of 47.1%, specific gas consumption is about 0.195 m³/kWh (at a gas calorific value of 9,000 kcal/m³). The parameter is used to calculate fuel costs (OPEX) and plan gas purchases.

Remaining Engine Life

Remaining engine life - the engine's remaining operating time until the next scheduled overhaul (top-end overhaul or major overhaul), calculated as the difference between the specified TBO and the actual operating hours. It is tracked using data from the DIA.NE controller and the myPlant platform. Knowing the remaining life makes it possible to plan the overhaul and spare parts purchases well in advance.

Upgrades and Retrofits

Gas Engine Genset Upgrade

Gas engine genset upgrade - updating a gas engine genset to improve its technical performance without replacing the entire unit. Main options:

  • replacing the control system (ESM2 → DIA.NE XT4 with connection to myPlant);
  • installing an SCR system to reduce NOx emissions;
  • adding an absorption chiller to move from cogeneration to trigeneration;
  • adapting the unit to run on biogas or a hydrogen blend.

KTS Engineering upgrades Jenbacher units of all series, including those built in the GE Jenbacher era (before 2018).

Retrofit

Retrofit - installing new-generation equipment on an existing skid or in an existing building. For gas engine gensets, it means replacing a worn engine with a new, more powerful Jenbacher engine while keeping the existing generator, electrical section and heating connections. A retrofit is more cost-effective than building a new facility: the existing infrastructure, design documentation and operating staff experience are reused. KTS Engineering performs retrofits both on Jenbacher units and on third-party units, replacing them with Jenbacher.

Controller Replacement (ESM2 → DIA.NE)

Controller replacement - upgrading the control system of a gas engine genset by replacing the outdated ESM2 controller with a modern DIA.NE XT4. The results:

  • connection of the unit to the myPlant platform for 24/7 remote monitoring;
  • advanced diagnostics (knock monitoring in each cylinder);
  • better control quality and lower gas consumption;
  • support for modern communication protocols for integration with SCADA.

KTS Engineering replaces controllers on Jenbacher units of all series.

Repowering

Repowering (engine replacement) - replacing a genset's gas engine with an engine of a newer model or generation while keeping the generator and external infrastructure. It is used when the base engine has reached the end of its service life or when a significant increase in output is required. For example, replacing three Jenbacher J316 engines (848 kW each) with two J420 engines (1,413 kW each) increases total output while reducing the number of units and simplifying maintenance.

Conversion to Hydrogen Fuel

Conversion to hydrogen fuel - adapting an existing Jenbacher cogeneration plant to run on natural gas / H2 blends or on pure hydrogen. Jenbacher engines in the Hydrogen Ready version can handle up to 25% H2 without modification. Moving to higher hydrogen concentrations requires replacing the prechamber gas valves, retuning the gas path and updating the DIA.NE software. KTS Engineering advises customers on hydrogen transition pathways for existing Jenbacher units.

Related terms: Jenbacher Hydrogen Ready

Questions and answers

Cogeneration is the simultaneous production of electricity and heat from a single fuel source. The gas engine drives a generator to produce electricity, while heat from the engine cooling jacket and exhaust gases is recovered by heat exchangers. Overall efficiency reaches 91%.